Skip to content

Region

Closed Woodford bridge: Redbridge Council awaits £80m from government

Broadmead Road Bridge in north-east London has been closed to vehicles since July 2023. Redbridge Council has bid for £80 million from a government fund to rebuild it and is waiting for a decision.

Author: Thames Compass editorial teamPublished: Region: London2 min read

Closed Woodford bridge: Redbridge Council awaits £80m from government

Broadmead Road Bridge in Woodford, in the London Borough of Redbridge, crosses the Central line of the Underground. It links the north and south of Woodford and carries vehicles from Essex and Epping that avoid the A406.

Why the bridge is closed

The council closed the bridge to vehicles in July 2023 after an inspection found cracks, falling concrete and corrosion on its legs and spans. The main concern was that pieces of concrete could fall onto the tracks. Pedestrians, cyclists and motorcyclists can still use the bridge. The council says around 15,000 vehicles used the route each day before the closure.

Railway tracks in London beneath road infrastructure (illustration).
Illustrative view: railway lines in London, similar to the tracks beneath bridges in Redbridge.

The funding bid

On 4 August 2026 the council submitted a formal bid to the Department for Transport under its Structures Fund. It seeks £80 million to demolish and rebuild the bridge. If the bid succeeds, the council would contribute around £20 million. According to council updates, a government decision is expected in autumn 2026, although the timetable could slip.

The chosen option is to demolish the existing bridge and build a new one, with reinforced soil wall approach ramps. The structure is about 245 metres long in total. Important underground utility services must be moved before work starts, and the project is expected to take several years.

Why the council is asking for government help

The council says its budget cannot cover a project of this scale without affecting other essential services. It has owned the bridge since 1985. In 2024 the council reported that Transport for London had made no commitment to share the cost. Council leaders say the closure is disrupting daily journeys and hurting local businesses and residents. They also point to years of reduced funding for local authorities.

The bid was backed by letters from local MPs, neighbouring councils and local schools. If government does not provide the money, the council has not named another source for the full cost of the project.

Sources

  1. Redbridge Council submits bid for £80m Government funding to rebuild Broadmead Road Bridge
  2. Broadmead Road Bridge – FAQs
  3. Cabinet agrees to replace Broadmead Road Bridge and fight for funding
  4. Broadmead Road Bridge - join our online meeting
  5. How a broken London bridge has split a community

This article was prepared automatically by AI from the listed sources and published without prior editorial review. Spotted a mistake? Use the “Report an error in this article” button.

Photos

Tags

Related articles

We only use essential cookies. Optional ones — only with your consent.

Settings